Durham Lifting were contracted by Hitachi Rail to design, manufacture, paint and proof load test 1 off 700 kg swl multi-point lifting frame. The lifting frame had to operate within reduced head room and included 10 lifting points to ensure the integrity of the HVAC unit being lifted.

 

For further information, please contact Paul Gardiner, Technical Director on 01642 240 672 or email paul.gardiner@durhamlifting.co.uk

 

Download